CUPRINS Nr. 3 / 2007

Popescu St. V., Nueleanu D.
S.C. I.C.S.I.T.P.M.L. S.A. Craiova - 40 de ani in slujba mineritului romanesc. Rolul si importanta sa in proiectarea si cercetare-dezvoltarea durabila a ramurii miniere de exploatare a lignitului in Romania - S.C. I.C.S.I.T.P.M.L. S.A. Craiova- 40 Years in Romanian Mining Service.The Role and Importance in Outlining and Research-Lasting Development of Lignite Exploitation in Romania
This paper shows the steps of formation and development during 40 years of S.C. ICSITPML S.A. Craiova. His role in outlining and research-lasting development of lignite mining exploitation in Romania.
Popescu St. V., Nueleanu D.
S.C. I.C.S.I.T.P.M.L. S.A. Craiova-Lucrari reprezentative - S.C. I.C.S.I.T.P.M.L. S.A. Craiova - Representative works
Here are presented representative works of Institute for Scientific Research, Technological Engineering and Mines Project on Lignite of Craiova.
Popescu St. V., Renta L.
Aspecte specifice care particularizeaza fenomenul geologic de la Seciuri Gorj - Specific Aspects That Customize The Geological Phenomenon of Seciuri, Gorj County
The big landfalls from Seciuri area, Gorj County, were started in the spring of 2006 under the circumstances of very important rain-falls. The affected area spread out on Seciuri, Gorj County, along the county road 675 C, Rosia de Amaradia-Poiana Seciuri.
Goreci Gh.
Considerente privind activitatea de proiectare la inchiderea si ecologizarea unitatilor miniere din Oltenia - Reasons Regarding The Design Activity at The Closure and Ecologization of Oltenia Mining Units
The program for the mining sector reorganization supposes the preservation and closure of unprofitable mining units, and keeping the profitable ones.
Costica St.
Prezentarea exploatarilor miniere la zi din cadrul E.M.C. Berbesti - Presentation of Mining Open Pits from EMC Berbesti
This paper makes a presentation of mining exploitations Oltet, Panga and Berbesti of E.M.C. Berbesti.
Florea M.
Prezentarea exploatarilor miniere la zi din cadrul perimetrului minier Motru - Presentation of Mining Open Pits of Motru Mining Perimeter
This paper makes a presentation of mining exploitations of Motru mining perimeter.
Cojocaru C., Predesel S., Stoian A.
Reconstructia ecologica si prevenirea deteriorarii mediului in conditiile incetarii activitatii la cariera Urdari, judetul Gorj - Ecological Reconstruction and Environment Deterioration Prevent on Conditions of Closure at Urdari Pit, Gorj County
Once the open lignite mining stopped, the morphology of land occupied by dam and pits levels imposes important and expensive arranging works to assure the stability of pit and dam slopes and water management, both inside the pit (remanent hole), and inside the areas of arranged valleys confluence.
Rosu A.
Modernizarea echipamentelor electrice, consecinta directa a dezvoltarii electronicii de putere si a conducerii proceselor tehnologice cu automate programabile - Modernization of Electrical Equipments, Direct Consequence of Power Electronic Development and of Technological Process Management by Automates Programmables
This paper analyses the situation of modernization of electrical equipments, direct consequence of power electronic development and of technological process management by automates programmables for lignite exploitation in Oltenia basin.
Smarandache M., Nueleanu D.
Optimizarea amplasarii statiilor si posturilor trafo in cariere - Optimizing the Location of Power Stations and Transformers in Open Pits
This paper analyses the optimization of location of power stations and transformers in lignite open pits by various computer programs.
Popescu M., Preda C., Dorneanu A., Nicolaescu I.
Ingrasaminte organo-minerale pe suport de lignit - varianta optima, necesara si posibila de utilizare a lignitului - Organ-Mineral Fertilizer on Lignite - Optimal, Needful and Possible Version to Utilize The Lignite
In this paper are presented the way to obtain fertilizers based on lignite with clay acids for the stabilization of soil entropy. Mineral fertilizers don't have clay acids and their utilization increase the humus impoverishment of lands.
Florea M.
Prezentarea perimetrului de dezvoltare exploatare Cariera Husnicioara Vest - Presenting of Exploitation Development Perimeter Husnicioara Vest
This paper presents the exploitation development perimeter of Husnicioara Vest pit, located in Mehedinti County.
Renta L., Patrascu C.
Fenomene geomecanice si procese specifice de instabilitate evidentiate in halda Bohorelu - Geo-Mechanical Phenomena and Specific Processes of Instability Pointed Out at Bohorelu Dam
This paper describes the geo-mechanical phenomena and specific processes of instability pointed out at Bohorelu dam, Gorj County.
Avram O.
Statie trafo 20/6 kv de mare putere de tip modular pentru Cariera Jilt Sud - High Power Transformer 20/6 kV by Modular Type for Jilt Sud Pit
The necessity of integration of electrical energy supply system of Jilt basin in the general context of energetic system development in Romania, in the view of alignment to European energetic market requests, imposed a global and specific analysis of this system.
Costica St.
Depunerea fluidului dens provenit de la CET Govora si implementarea acestuia in tehnologia de ansamblu a haldei interioare a Carierei Panga - The Sedimentation of Dense Fluid Came from CET Govora and his Implementation in Global Technology of Interior Dam of Panga Pit
The waste deposits from coal extractive industry are considered compliant, based on projects and for which are provided stabilization, monitoring and closure works. According to Directive no. .that stipulate the storage of ashes as dense fluid, a complex collective made by specialists from CET Govora, SNLO Tg. Jiu, S.C. ICSITPML S.A. Craiova and AGRARO CONSULT SRL Bucuresti studying the possibilities to deposit the dense fluid from CET Govora and his implementation in the interior dam of Panga pit.